BIOGREEN CLEANROOM PROJECT

Custom Cleanroom Solutions Engineered Around Your Process

Every cleanroom project has different process, contamination control, airflow and environmental requirements.

Biogreen designs and delivers custom cleanroom solutions based on your production process, ISO classification, temperature and humidity targets, pressure strategy, personnel and material flow, equipment layout and applicable regulatory requirements.

From concept design to installation and qualification support, we help you build a controlled environment that fits your actual operation.

modular cleanroom cost
cleanroom renovation contractor

Tell Us What Your Cleanroom Needs to Achieve

Before defining equipment or room configuration, our engineers first establish the project design basis. The following information helps determine the appropriate cleanroom layout, environmental control strategy and system configuration.

Industry & Manufacturing Process

What product will be manufactured, assembled, tested or packaged inside the cleanroom?

Cleanroom Classification

ISO Class 5, 6, 7 or 8; GMP Grade A, B, C or D; or define it from process risk if not yet known.

Temperature & Humidity

Define process, product, operator and moisture-control conditions.

Pressure Strategy

Positive pressure, negative pressure, pressure cascade or independent containment zones.

Personnel Flow

Outside → Changing Room → Gowning Room → Personnel Airlock → Clean Corridor → Process Room.

Material Flow

Receiving → Cleaning / Preparation → Material Airlock → Pass Box / Transfer System → Production Area → Finished Product / Waste Exit.

Production Equipment

Equipment dimensions, heat load, exhaust, utilities and maintenance access influence room and HVAC design.

Future Capacity

Allow for additional production lines, cleanrooms, airflow capacity, utilities and modular expansion.

We Engineer the Cleanroom Around Your Process

Once the design requirements are established, Biogreen converts them into an integrated cleanroom engineering solution. Each system is designed together rather than as an independent component.

Cleanroom Layout Design

Developed around production flow, equipment position, personnel movement, material transfer and maintenance access.

HVAC Engineering

Sized around cleanliness level, heat load, occupancy, process equipment, outdoor conditions, temperature, humidity and pressure strategy.

Airflow Strategy

Non-unidirectional, unidirectional, mixed airflow or localized critical zones according to contamination risk.

modular cleanroom cost

Your Cleanroom

HEPA & ULPA Filtration

Pre-filters, medium-efficiency filters, HEPA filters, ULPA filters, HEPA terminal boxes and FFUs as required.

Pressure Cascade

Differential pressure controls airflow between adjacent spaces for product protection, containment and cross-contamination control.

Temperature & Humidity Control

Standard comfort, tight temperature control, tight RH control, low-humidity rooms and process-specific environmental conditions.

One Integrated Cleanroom System

A reliable cleanroom is not created by a single wall panel, air conditioner or HEPA filter. Performance depends on how architecture, HVAC, filtration, access control and monitoring systems work together. Biogreen integrates these systems into one coordinated cleanroom solution.

Architecture

HVAC

Filtration

Personnel Control

Material Transfer

Environmental Monitoring

Automation & Control

Cleanroom Architecture

Modular walls, ceilings, epoxy/PVC/ESD floors, airtight doors, interlocking doors, flush windows and walkable ceilings.

HVAC System

AHU, supply ductwork, return air, fresh air, exhaust, cooling, heating, humidification and dehumidification.

Air Filtration

HEPA terminal filters, FFU systems, ULPA filtration and multi-stage AHU filtration.

Personnel Control

Changing rooms, gowning rooms, personnel airlocks, air showers and interlocking doors.

Material Transfer

Pass boxes, dynamic pass boxes, VHP pass boxes, material airlocks and cargo air showers.

Environmental Monitoring

Temperature, relative humidity, differential pressure, particle concentration, equipment status and alarms.

Automation & Control

PLC, BMS, EMS, HVAC control, pressure monitoring, alarms and access control.

Project Case Studies

Please contact us for any cleanroom needs.

Let's have a chat