A pharmaceutical cleanroom URS checklist is where a cleanroom project should begin. If the URS is vague, designers fill gaps with assumptions that later become change orders, qualification failures, or operating problems. A URS is not an equipment purchasing list; it converts product, process, regulatory, and operating needs into verifiable design requirements.
Classification, pressure, temperature, humidity, and ACH cannot be selected independently. They must follow product exposure risk, occupancy, heat load, containment strategy, recovery target, and the applicable GMP framework.
Table of Contents
ToggleWhat Is a Cleanroom URS?
A cleanroom user requirement specification defines what the facility must achieve; detailed design explains how it will achieve it. A GMP cleanroom URS should state performance, operating states, interfaces, acceptance criteria, and required evidence rather than locking every duct size or fan model before engineering is complete.
The cleanroom user requirement specification feeds design, DQ, IQ, and OQ. The cleanroom DQ requirements confirm the design against the URS, while IQ OQ cleanroom requirements verify installation and operation against approved criteria.
In our experience, a structured cleanroom URS template reduces late clarification because QA, production, validation, and engineering must agree on measurable criteria before procurement. A good GMP cleanroom URS also prevents “design by vendor assumption.”
Product and Process Information
Before defining pharmaceutical cleanroom requirements, collect:
- Product type and dosage form
- Sterile or non-sterile status
- Open or closed processing
- Maximum product exposure time
- Contamination and cross-contamination risks
- Cleaning agents, disinfectants, and sporicides
- Batch size, throughput, shifts, and maximum operators
These inputs drive cleanroom design requirements and sterile manufacturing cleanroom requirements. An open aseptic filling step and a closed formulation vessel should not receive identical environmental assumptions simply because both are pharmaceutical processes.
From the projects we’ve completed, missing occupancy and equipment data is a frequent cause of HVAC redesign. Increasing a room from four planned operators to eight changes sensible heat, particle generation, gowning capacity, and recovery behavior.
The same principle applies to GMP facility design requirements: define the process boundary before defining the room. Pharmaceutical cleanroom requirements should reflect actual production rather than another factory’s room schedule.
Room Classification and Operating State
Cleanroom classification requirements should state the GMP Grade, ISO Class, and required condition: as-built, at-rest, or operational. ISO 14644-1 defines particle-concentration-based classification, while EU GMP Annex 1 establishes Grade A-D functions and classification expectations for sterile manufacturing.
Do not use a universal “GMP Grade = ISO Class” conversion without operating-state and process context. Cleanroom classification requirements should also define the relationship between critical and background areas and whether protection comes from RABS, an isolator, or local unidirectional airflow.
Annex 1 gives 0.36-0.54 m/s as a guidance range for unidirectional airflow at the working position and a clean-up guidance value of less than 20 minutes, subject to scientific justification and qualification.

Personnel and Material Flow
The layout should define cleanroom personnel flow and cleanroom material flow before walls are frozen. Cover personnel entry and exit, gowning, raw materials, finished product, waste, maintenance access, and any crossing between inbound and outbound routes.
EU GMP Annex 1 identifies equipment and material transfer as a major contamination risk and recommends separate personnel and material airlocks where practical. Where physical separation is impractical, justified time-based separation may be considered.
For cleanroom personnel flow, show each gowning transition and maximum room occupancy. For cleanroom material flow, document de-bagging, disinfection, sterilization, staging, finished-product transfer, and waste removal.
HVAC and Environmental Requirements
A pharmaceutical HVAC URS should define:
- Temperature and relative humidity
- Pressure direction and alarm limits
- Room recovery time
- Outdoor-air and exhaust requirements
- Equipment and personnel heat loads
- Solvent or hazardous-process exhaust
- HEPA or ULPA filtration
- Monitoring and alarm points
- Production, cleaning, and standby modes
EU GMP Annex 1 gives 10 Pa as a guidance minimum between adjacent rooms of different grades. FDA aseptic-processing guidance recommends 10-15 Pa between adjacent rooms of different classifications and states that about 20 ACH can be acceptable for ISO 8 supporting rooms, while cleaner areas generally require higher airflow.
These figures are design references, not universal cleanroom pressure cascade requirements. A pharmaceutical HVAC URS should instead state the contamination-control objective, allowable operating range, alarm strategy, and verification method.
Cleanroom pressure cascade requirements may also reverse where containment of pathogenic, toxic, or potent materials takes priority over positive-pressure product protection.

Architectural and Finish Requirements
Specify wall panels, ceilings, coving, doors, glazing, flooring, penetrations, lighting, sealing, cleanability, and chemical resistance. Annex 1 requires exposed cleanroom surfaces to be smooth, impervious, and unbroken; FDA guidance likewise calls for smooth, hard, easily cleanable surfaces in aseptic processing areas.
Cleanroom design requirements should also identify cleaning-chemical compatibility and penetration sealing. Local fire, structural, and egress obligations may come from an adopted IBC or equivalent code; the IRC is primarily residential and is not a substitute for GMP facility design requirements.
Process Utilities and Equipment Interfaces
Define purified water, clean steam, compressed air, process gases, electrical power, UPS, drainage, equipment exhaust, and BMS/EMS interfaces. For each interface, state required quality, capacity, connection point, monitoring, redundancy, and responsible party.
Sterile manufacturing cleanroom requirements can fail at interfaces even when the room itself performs correctly. FDA guidance states that utilities capable of affecting product quality should be appropriately qualified and monitored, so “by others” should never be the only definition of scope.
Monitoring, Alarms and Data Requirements
Define monitored parameters, sensor locations, recording intervals, alert and action levels, user permissions, trending, backup, retention, and audit trails during the URS stage.
A cleanroom URS template should contain these data requirements even for smaller facilities. For Grade A processing, EU GMP Annex 1 requires continuous particle monitoring during critical processing and specifies a sample flow rate of at least 28 L/min.
Leaving these decisions until OQ can reveal expensive gaps, such as a system that records room temperature but does not retain pressure alarms, acknowledgments, or user changes.
Qualification and Documentation Deliverables
Cleanroom qualification requirements should be defined before procurement. Typical deliverables include:
- Design Qualification
- FAT and SAT documentation
- IQ/OQ support
- Airflow and balancing reports
- HEPA integrity testing
- Particle classification
- Pressure differential testing
- Airflow visualization
- Temperature and humidity verification
- Recovery testing
- Approved drawings and equipment data
- Calibration certificates
- Operation and maintenance manuals
EU GMP Annex 1 includes airflow volume, pressure difference, airflow direction and visualization, microbial contamination, temperature, humidity, recovery, and containment leak testing within qualification activities. It also sets maximum requalification intervals of 6 months for Grade A/B and 12 months for Grade C/D.
Cleanroom qualification requirements should trace directly to cleanroom DQ requirements. The traceability matrix should identify whether each requirement is verified through DQ, FAT/SAT, IQ, OQ, or another test so IQ OQ cleanroom requirements do not become a disconnected document set.

Pharmaceutical Cleanroom URS Checklist: Review Table
The following structure can be converted directly into an Excel or CSV review sheet:
Requirement | Rationale | Acceptance Criterion | Verification Method | Responsible Party |
Room pressure | Control contamination migration | Project-defined; ≥10 Pa where justified | Differential-pressure test | HVAC / Validation |
Temperature | Process and operator needs | Approved project range | OQ trend test | HVAC / QA |
HEPA integrity | Protect filtered-air boundary | Approved leak-test criterion | Installed filter test | Validation |
Recovery | Restore qualified condition | Qualified project target | Recovery test | Validation |
Material transfer | Reduce transfer contamination | Approved directional or time-separated route | Drawing + SOP review | Production / QA |
Every requirement needs both a rationale and measurable acceptance criterion. If a requirement cannot be objectively verified, it is probably still too vague.
Common URS Mistakes
Common problems include:
- Copying another plant’s URS without matching its process
- Fixing ACH at one number without contamination, heat-load, or recovery justification
- Omitting process-equipment heat loads
- Failing to define at-rest and operational states
- Writing requirements without acceptance methods
- Leaving contractor, owner, equipment-vendor, and validation boundaries unclear
A stronger URS does require more engineering work before procurement. The opposite problem is over-prescription: defining equipment and engineering solutions too early can restrict energy optimization, equipment selection, maintainability, and layout improvement.
A pharmaceutical cleanroom URS checklist should make every major requirement traceable from product risk to design basis and then to qualification evidence. When classification, flow, HVAC, finishes, utilities, monitoring, and verification criteria are measurable, the URS becomes the control document that keeps cleanroom design, construction, commissioning, and qualification aligned.
We'll call you
In order to serve you better, if you could kindly send an e-mail to nick@biogreenness.com for questions and details about your theoretical and special architectural plans, projects, and product specifications, your request will be responded to as soon as possible.
We'll call you
In order to serve you better, if you could kindly send an e-mail to nick@biogreenness.com for questions and details.