CALL AN EXPERT! +86-131-3073-8426
Pharmaceutical & GMP Cleanroom Engineering
Cleanroom environments engineered around your pharmaceutical process, contamination risks and regulatory requirements—from GMP zoning and personnel flow to HVAC, filtration and qualification support.
Biogreen supports pharmaceutical, vaccine, biotechnology,sterile and aseptic processing facilities with integrated pharmaceutical cleanroom design solutions developed around production requirements, applicable GMP expectations and cleanroom performance targets.

Process Risk Drives Cleanroom Design
Safety With Precision
We evaluate your process to identify contamination, cross-contamination, and operator exposure risks. These insights shape zoning, airflow, pressure differentials, material selection, and operational protocols.
Risk-based design is not just compliant—it’s smarter, safer, and more efficient.
We build GMP facilities that protect your product, your people, and your reputation.

GMP Cleanroom Zoning &
Classification (Zone Plan)
Cleanroom zoning is based on risk assessment and defines the required cleanliness level for each area. Our zoning strategy minimizes unnecessary personnel and material crossover, maintains defined pressure relationships and supports controlled movement between cleanroom areas.

Contamination Control Strategy
From The Inside Out
A robust contamination control strategy is the foundation of a compliant and reliable cleanroom.
We design for:
- Controlled environments (ISO classification)
- Pressure cascades and differential control
- Surface and material compatibility
- Personnel, material, and waste flow
- Cleaning and disinfection protocols
- Monitoring and documentation
Every element is engineered to minimize risk and maintain cleanroom integrity.

Personnel, Material & Waste Flow
In A Controlled Environment
We define gowning SOPs, airlocks, and flow paths to prevent cross-contamination.
Personnel Flow
• Gowning → Airlock → Clean Areas
Material Flow
• Receipt → Staging → Airlock → Clean Areas
Waste Flow
• Clean Areas → Waste Isolation → Disposal

HVAC and Airflow Engineering
You Can Rely On
Our HVAC systems are designed for precision, efficiency, and compliance.
- HEPA/ULPA filtration
- Air change rate determined according to cleanliness classification, process load, recovery requirements and contamination-control strategy
- Temperature & humidity control
- Pressure cascade management
- Energy-efficient systems
- Real-time monitoring & alarms

Pharmaceutical Cleanroom Envelope
Built For Performance
The cleanroom envelope includes walls, ceilings, floors, doors, and windows.
- Smooth, non-shedding, and cleanable finishes
- Flush-fitted with minimal joints
- Chemical- and impact-resistant materials
- Airtight and durable construction
- Thermal and moisture stability


Qualification & Validation Support
We support your facility through the full validation lifecycle.
- DQ, IQ, OQ, PQ Protocols
- FAT & SAT Coordination
- Cleanroom Performance Testing
- Airflow Visualization
- Particle Counting & Microbial Testing
- Documentation & Compliance Support
What We Need To Start Your
Pharmaceutical Cleanroom Design
Share the following details so we can begin your project with clarity and speed.
- Process Flow Diagram
- Product Details & Batch Size
- Target Cleanliness Class (ISO Grade)
- Regulatory Requirements
- Site Layout / Building Plan
- Utility Availability (HVAC, Power, Water)
- Timeline & Project Scope
Why Pharmaceutical Manufacturers Work With Biocrtech
GMP & Regulatory
Expertise
Deep knowledge of WHO-GMP, EU GMP, US-FDA, and cGMP.
End-to-End
Solutions
Concept to commissioning—we handle it all.
Risk-Based
Engineering
Designed for safety, compliance, and operational excellence.
On-Time
Delivery
Reliable execution with clear timelines and milestones.
Client-Centric
Approach
We listen, we care, and we deliver lasting value.
Frequently Asked Questions
We design around applicable WHO-GMP, EU GMP, cGMP, ISO 14644 and project-specific requirements.
Yes. We support retrofit, expansion, reclassification and phased cleanroom upgrades.
Classification is defined according to process risk, product protection needs and applicable standards.
Yes. Support can include DQ/IQ/OQ/PQ coordination, FAT/SAT, testing and documentation.
Timeline depends on facility size, utilities, approvals, equipment lead times and site conditions.
Yes. We can integrate concept, engineering, construction, HVAC, installation, commissioning and validation support.



